Drainage, bulldozer clearance, widening and excavation across connected road sections.
Bulldozer widening, clearance and make-safe operations, 8 June 2026.
THE SITE & THE WORK
A connected workfront.
The connected rural-road workfront involved road width, formation and drainage needs. Excavation, loading, haulage and clearance had to be planned as parts of the same programme.
KBBW’s role
KBBW’s portfolio shows new soil-and-water conservation drainage toward Narata, excavation and loading on Nasau Road, and bulldozer widening, clearance and make-safe operations on 8 June 2026.
What the work demonstrates
The work demonstrates the complementary use of excavators, a bulldozer, trucks and field crews to address drainage and formation requirements across a regional road programme.
Soil-and-water conservation drainage from Nawamagi toward Narata.Excavation and loading supporting the Narata–Nawamagi programme.
LET’S GET THINGS MOVING
Bring your project into the conversation.
Share the location, the work required and a way to reach you. Scope and availability are confirmed before booking.